Eliufoo, H. K. (2018). PRELIMINARY ESTIMATES OF BUILDING COST AND THE LOWEST EVALUATED TENDER. Tanzania Journal of Engineering and Technology, 30(1). Retrieved from http://196.44.161.124/index.php/tjet/article/view/1758